After all demand factors have been taken into consideration for a commercial building, the balanced demand load is determined to be 75 kVA; the building has a 208Y/120 volt, 3-phase electrical system. What MINIMUM size copper conductors with THWN insulation are required for the ungrounded (phase) service-entrance conductors?
Click card to flip between front and back. Use check box to flag cards for review.   Shuffle Cards
Review Flash Cards in Table View
2023 Edition  © 2022 Tests.com.